Table 6. Work method by process (sikhye)

No. Process steps Process description Main equipment Management method
1 Receiving / storage - Check for contamination of raw materials Thermometer, refrigerator Visual inspection, temperature measurement
- Low temperature maintenance for maintaing raw material freshness
- Check temperature and cleanliness
2 Washing - Prevent foreign material inhalation of raw materials Washing water Visual inspection
- Remove dust
3 Primary weighing - Raw materials and subsidiary materials are weighed according to the mixing ratio Scissors, knife, chooping board, scale Visual inspection
4 Grinding / percolation Grinding and filtration after the first weighing of raw materials Grinder, 20 mesh sieve Visual inspection
5 Secondary weighing After filtration, weigh different components according to blending ratio Scale Visual inspection
6 Mixing - Mix after blending to mix ratio Scale Visual inspection
7 Heat sterilization - Heat sterilzation after mixing Burner, pot, thermometer Visual inspection
8 Cooling - Cool to 30°C after heat sterilization Thermometer Visual inspection
9 Packing - Packed in a dedicated container Packing container Visual inspection
10 Storage / releasing - Stored and released at sale Refrigerator Visual inspection